Ivankovo ​​hydro power plant, Moscow region

  • 2001 – overhaul of G-1 (hydroelectric unit), modernization of the impeller blades.
  • 2002 – overhaul of G-2, modernization of the wicket gate.
  • 2008 – design and survey works on the overhaul of G-1.
  • 2009г. – overhaul of G-1, with modernization of the control system.
  • 2009-2012 – comprehensive reconstruction of outdoor switchgear of 110 kV.
  • 2010 – current repair of frame cranes №3,4 with load-carrying ability 150t.
  • 2011 – current repair of frame cranes №1,2 with load-carrying ability 150t.
  • 2012 – design work. Modernization of the main and support equipment.
  • 2013 – current repair of servo motors of the wicket gate of hydroelectric unit №1.
  • 2013 – current repair of transformers №1 and №2 TRDN- 25000/U1.

Skhodnenskaya hydro power plant, Moscow

  • 1998 – overhaul of G-1.
  • 1999 – overhaul of G-2.
  • 2006 – overhaul of G-1, with the impeller reconstruction, modernization of pedestal, turbine bearing and the introduction of the automated control system.
  • 2009 – overhaul of G-2, the introduction of the automated control system.
  • 2008-2009 – outdoor switchgear of the hydro power plant - replacement of KSO cells, repair of oil circuit breakers and disconnector fuses.
  • 2011-2012 – current repair of hydropower and hydro-mechanical equipment
  • 2012 – overhaul of G-1 with replacement of oil coolers.
  • 2013 – overhaul of GA №1 with replacement of oil coolers.

Perervinskaya hydro power plant, Moscow

  • 2002 – overhaul of G-1.
  • 2003 – overhaul of G-2 with modernization of the pedestal assembly unit, wicket gate, modernization of support systems of the hydro power plant.
  • 2011-2013 – overhaul with modernization of two hydroelectric units.
  • 2012 – current repair of hydro-mechanical equipment.

Karamyshevskaya hydro power plant, Moscow

  • 2001 – current repair of turbine bearing of G-1.
  • 2003 – current repair of turbine bearing of G-2 and process water supply systems.
  • 2009 – design and survey works on the overhaul of G-1 and G-2.
  • 2011 – overhaul of G-1, process water supply system, spillway dike gates and G-2
  • 2012 – current repair of steel structures and dike gantry ways.
  • 2012 – current repair of the dike gantry stoplog gate.
  • 2012 – current repair of the winding of section of generator stator №1.

Novo-Tveretskaya hydro power plant

  • 2011-2012 – overhaul with generator shaft replacement GA-2.

Pumping station № 182, Moscow region

  • 1999 – current repair of the pumping unit generator № 1.
  • 2002 – replacement of the pumping unit № 3.
  • 2007 – replacement of the pumping unit № 4.
  • 2010 – replacement of the pumping unit № 1 and intake chamber equipment.
  • 2010 – manufacturing trash-rack structures.
  • 2011 – reconstruction of the water intake with development of flow-regulating valve area.
  • 2011 – current repair of the pumping unit № 3.
  • 2011 – replacement of mechanical intake chamber equipment.
  • 2012 – replacement of electrical equipment.
  • 2012 – replacement of the lighting system.
  • 2012 – replacement of the panel block of indoor switchgear equipment.
  • 2013 – a complex of works on replacement of mechanical and electrical equipment, including replacement of the fifth pumping unit OPV 34-9/VG within The Technical re-equipment of pumping stations.

Pumping station № 183, Moscow region

  • 2011 – replacement of mechanical intake chamber equipment.
  • 2012 – replacement of electrical equipment.
  • 2012 – replacement of the lighting system.
  • 2012 – replacement of the panel block of indoor switchgear equipment.

Pumping station № 184, Moscow region

  • 2011 – replacement of mechanical intake chamber equipment.
  • 2012 – replacement of electrical equipment.
  • 2012 – replacement of the lighting system.
  • 2012 – replacement of the panel block of indoor switchgear equipment.

Pumping station № 185, Moscow region

  • 2010 – replacement of support systems.
  • 2011 – replacement of mechanical intake chamber equipment.
  • 2012 – replacement of electrical equipment.
  • 2012 – replacement of the lighting system.
  • 2012 – replacement of the panel block of indoor switchgear equipment.

Pumping station № 186, Moscow region

  • 2007 – replacement of the pumping unit № 1.
  • 2010 – replacement of support systems.
  • 2011 – replacement of mechanical intake chamber equipment.
  • 2012 – replacement of the pumping unit № 5.
  • 2012 – replacement of electrical equipment.
  • 2012 – replacement of the lighting system.
  • 2012 – replacement of the panel block of indoor switchgear equipment.
  • 2013 – a complex of works on replacement of mechanical and electrical equipment, including replacement of the fifth pumping unit OPV 34-9/VG within The Technical re-equipment of pumping stations.

Undersluices of Moscow RGS, Moscow.

  • 2007-2009 – current repair of miter gates, segment gates, culverts et al.

Undersluices of Tushino RGS, Moscow.

  • 2007-2009 – current repair of miter gates, segment gates, culverts et al.
  • 2011 – current repair of lock guard gates №105.

Undersluices of Volzhsky RGS, Moscow region.

  • 2011 – current repair of lock guard gates №104.
  • 2013 – modernization of the crane automatic controls №1 with load-carrying ability 150 t.
  • 2013 – modernization of the crane automatic controls №2 with load-carrying ability 150 t.